With the age, the condition of a place can be inferior if proper maintenance is not done. Lifetime Radon Mitigation is providing its services in Wisconsin for more than two decades. We are working considering all the rules and regulations of Environmental Protection Agency (EPA). According to EPA rules and regulations, the level of any gas above the required value can be dangerous and if not timely cured it can be worse. Radon Mitigation MN services are the best way to overcome the problem with effective use on technology and knowledge. According to EPA if the level of radon is above 4pCi/L or above then it should be mitigated and we are at your service to do that.

Radon mitigation assembly involves drilling system, venting system, piping assembly and fan installation. There are various procedures to install radon mitigation assembly. All the systems are installed after detailed visual inspection of place to understand condition of the place and to judge that what system will be preferable for your place. Our mitigation process involves sub slab depressurization, drain tile depressurization, block wall depressurization and crawl space depressurization. Any of the above treatment is used in the mitigation assembly and is chosen based on the visual analysis of your place.

The indoor radon mitigation system can be of four types;

One is the active system in which the radon mitigation system is installed after the construction. Basically, radon mitigation system is used to avoid the problem due to the presence of radon gas. Inspection is done under supervision of our experts and after inspection system is installed. The whole is drilled in the basement at suitable point. The drilling process can take time considering the difficulties involved i.e. toughness of the ground, any metal material in the way etc. After drilling, the required piping assembly is installed. During inspection, the cracks and openings in the ground are filled with blocking material to provide the only one channel for the gas flow i.e. Piping assembly. After the drilling is complete the indoor and outer assembly is installed which involves the installation of the fan and the outer duct. This type of installation requires deep knowledge and proper working.

Second one is the passive installation in which the system is installed during the construction of your place. There is no need to install the additional hole in the ground for outer channel for flow because the piping assembly is installed during construction and it can be an easy process for the customers.

The third system is based on the pressure difference. In this system after the assembly installation it is advised to the customers to remain close the door and windows of the drilled ground so that the gases can be moves upward due to pressure difference.

Final installation system involves the covering the whole ground with plastic sheets to cover crawl spaces and this system is expensive than others. This system is installed when there are muddy and loose gravel ground.